CCR Rule Compliance Data and Information

Cooper Station Landfill

 

Reports

                       

Location Restrictions 257.107(e)

Placement above the uppermost aquifer

Seismic impact zones

Unstable areas

Fault areas

Wetlands

 

Design Criteria

Pre-Construction design and construction certifications for new CCR Landfills and Lateral Expansions 257.107 (f) (1)

Post-Construction certifications for new CCR Landfills and Lateral Expansions 257.107 (f) (2)

           

Operating Criteria

Fugitive Dust Plan 257.107 (g) (1)

                Cooper_20151006_Fugitive Dust Control Plan

Annual Fugitive Dust Report 257.107 (g) (2)

                Cooper_20161201_Annual Fugitive Dust Report

Initial and Periodic Run-on Run-off Control System Plan (Landfills) 257.107 (g) (3)

                Cooper_Landfill_20161014_Run-On and Run-Off Control System Plan

Corrective Measures to respond to a deficiency or release 257.107 (g) (6)

Initial and Periodic Annual Inspection Landfills 257.107 (g) (7)

                Cooper_Landfill_20160114_Annual CCR Inspection Report           

          Cooper_Landfill_20170113_Annual CCR Inspection Report

Groundwater

Annual Groundwater Monitoring and Corrective Action Report 257.107 (h) (1)  

Groundwater Monitoring System Design and Construction Certification 257.107 (h) (2)

Cooper_Landfill_20171017_Groundwater Monitoring System Certification

Certification of the Selection of Statistical Method (Groundwater Monitoring Plan) 257.107 (h) (3)  

                Cooper_Landfill_20171010_Statistical Method Selection & Certification

Notification that an assessment monitoring program has been established 257.107 (h) (4)  

Notification that the CCR Unit is returning to a detection monitoring program 257.107 (h) (5)  

Notification that a constituent level is statistically significant 257.107 (h) (6)  

Notification that an assessment of corrective measures has been initiated 257.107 (h) (7)  

Assessment of corrective measures 257.107 (h) (8)  

Semi-annual reports describing remedy selection 257.107 (h) (9)   

Notification of remedy completion 257.107 (h) (10) 

 

Closure/Post Closure

Written Closure Plan 257.107 (i) (4)

                Cooper Written Closure Plan 257.107 (i) (4)

Demonstration for time extension to Initiate Closure 257.107 (i) (5)  

Demonstration for time extension to Complete Closure 257.107 (i) (6)  

Notification of Intent to Initiate Closure 257.107(i) (7)

Notification of Closure Completion 257.107 (i) (8)  

Notification of Recording a Notation on the Deed 257.107 (i) (9)  

Notification of Intent to comply with Alternative Closure requirements 257.107 (i) (10)  

Annual progress reports under the alternative closure requirements 257.107 (i) (11)  

Written post closure plan and any amendment of the plan 257.107 (i) (12)

                  Cooper_Landfill_20161013_Post-Closure Plan

Notification of Post-Closure Care Completion 257.107 (i) (13)